Vitol Power International

Electrical Testing

Discoveries United

torr-signwritten-van

About Us

Welcome to Torr Engineering! Based in Grimsby - Lincolnshire, Torr have been delivering specialist refrigeration & air conditioning projects throughout the UK since 2009. If you have the time please take a brief tour around our website to find out more about us and what we can offer. If you need us NOW, you can call us 24/7 on 0845•0945•188. Torr Engineering was founded in 2009 by two experienced and time served engineers to provide specialist refrigeration and air conditioning services. We are based in Grimsby, North East Lincolnshire and since our inception we have served clients all over the UK. Torr...

Read More
refrigeration-condenser-units-roof-mounted-oil-refinery
Services

Our services include: Design Installation Service & Maintenance Reactive Repair   For all refrigeration & air conditioning systems within the...

Read More
Air conditioning indoor unit
Air Conditioning

It still surprises us that many people think that air conditioners just keep you cool in summer. Today's air conditioning...

Read More
torr-reactive-header
Refrigeration

Refrigeration supply, installation, maintenance & repair - Torr Engineering are committed to delivering all your refrigeration solutions both locally in...

Read More
Torr Engineering can provide labour support for your project
Labour Support

Torr Engineering provide Labour Support teams to assist other contractors or projects in need of extra man power. It may...

Read More

Portfolio

A sample of our work

Tale of Two Cleethorpes air conditioning installation by Torr Engineering

Tale of Two – Cleethorpes

A popular local bar & restaurant, the Tale of Two on Cleethorpes seafront, contracted Torr to upgrade its air conditioning in the main restaurant and function room. An existing defunct system was removed to make way for 2 new Mitsubishi wall mounted systems in the restaurant and one new one in the function room.  The roof […]

new-tottenham-stadium

Tottenham Hotspurs New Stadium – London

Torr are proud to have played a key roll in the refrigeration system installation at Tottenham Hotspurs iconic new football stadium. This huge refrigeration project started in November 2017 and was completed in August 2018. We were tasked with installing the refrigeration services that served every single bar, cellar, freezer and the stadium’s own integral […]

Air conditioning condenser units installed by Torr Engineering at Bring Cargo Stallingborough

Bring Cargo – Stallingborough

Local logistics company and long term Torr client Bring Cargo contracted us to replace an ageing VRF air conditioning system. The system was 20 years old and had suffered a number of age related part failures. As a result the decision was made to renew the system rather than invest any more on the old […]

Air conditioning installation by Torr Engineering at Yorkshire Water's Rocc building Bradford

Yorkshire Water – Bradford

Torr Engineering were commissioned by Honeywell to replace an ageing Airedale Air Handling Unit (AHU) air conditioning system with the latest state of the art Mitsubishi Split systems at the Yorkshire Water live operations centre – Rocc building in Bradford. The contract involved installing 1.5km of pipework to 11 ceiling mounted cassette systems, fed by 7 […]

Lindum packaging multi split air conditioning installed by Torr Engineering - Grimsby.

Lindum Packaging – Stallingborough

Local packaging company Lindum Packaging contracted Torr Engineering to refit their newly expanded office space with energy efficient air conditioning to provide both cooling and heating. The chosen equipment was a Mitsubishi Heavy Industries multi split inverter condenser, which has the capacity to run 6 individual indoor wall mounted fan coil units. The condensing unit […]

Steam train Mallard at the National Railway Museum York

National Railway Museum – York

Completed in June 2010 at the National Railway Museum in York, this install required some out of the ordinary solutions! The brief for this installation was not to keep vistors cool in summer, but to keep the trains warm in winter! It’s always a pleasure having free range of this wonderful museum, and luckily for […]


 

Testimonials

What our clients say about us

We had two air conditioners / heaters installed last year and it’s the best thing we could have done. Not only exceptionally economical but heat up or cool down the room in minutes. The Torr personnel are very efficient, polite and punctual and get the job done with minimum fuss. After care servicing is dealt […]

Michele – The Ship Inn – Barnoldby Le Beck The Ship Inn Barnoldby le Beck

Install is important but maintenance is key! We have used the Team at Torr Engineering for a number of projects over the years. Their work is fantastic, organised and efficient. More important, however, is their approach to planned, preventative maintenance. We look forward to the regularly scheduled maintenance visits where cheerful technicians ensure that our […]

Murray Sellars – Lindum Packaging – Stallingborough Murray Sellars of Lindum Packaging Stallingborough